aboutsummaryrefslogtreecommitdiffstats
path: root/ui/status/critical_path.go
diff options
context:
space:
mode:
Diffstat (limited to 'ui/status/critical_path.go')
-rw-r--r--ui/status/critical_path.go152
1 files changed, 152 insertions, 0 deletions
diff --git a/ui/status/critical_path.go b/ui/status/critical_path.go
new file mode 100644
index 00000000..444327ba
--- /dev/null
+++ b/ui/status/critical_path.go
@@ -0,0 +1,152 @@
+// Copyright 2019 Google Inc. All rights reserved.
+//
+// Licensed under the Apache License, Version 2.0 (the "License");
+// you may not use this file except in compliance with the License.
+// You may obtain a copy of the License at
+//
+// http://www.apache.org/licenses/LICENSE-2.0
+//
+// Unless required by applicable law or agreed to in writing, software
+// distributed under the License is distributed on an "AS IS" BASIS,
+// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
+// See the License for the specific language governing permissions and
+// limitations under the License.
+
+package status
+
+import (
+ "time"
+
+ "android/soong/ui/logger"
+)
+
+func NewCriticalPath(log logger.Logger) StatusOutput {
+ return &criticalPath{
+ log: log,
+ running: make(map[*Action]time.Time),
+ nodes: make(map[string]*node),
+ clock: osClock{},
+ }
+}
+
+type criticalPath struct {
+ log logger.Logger
+
+ nodes map[string]*node
+ running map[*Action]time.Time
+
+ start, end time.Time
+
+ clock clock
+}
+
+type clock interface {
+ Now() time.Time
+}
+
+type osClock struct{}
+
+func (osClock) Now() time.Time { return time.Now() }
+
+// A critical path node stores the critical path (the minimum time to build the node and all of its dependencies given
+// perfect parallelism) for an node.
+type node struct {
+ action *Action
+ cumulativeDuration time.Duration
+ duration time.Duration
+ input *node
+}
+
+func (cp *criticalPath) StartAction(action *Action, counts Counts) {
+ start := cp.clock.Now()
+ if cp.start.IsZero() {
+ cp.start = start
+ }
+ cp.running[action] = start
+}
+
+func (cp *criticalPath) FinishAction(result ActionResult, counts Counts) {
+ if start, ok := cp.running[result.Action]; ok {
+ delete(cp.running, result.Action)
+
+ // Determine the input to this edge with the longest cumulative duration
+ var criticalPathInput *node
+ for _, input := range result.Action.Inputs {
+ if x := cp.nodes[input]; x != nil {
+ if criticalPathInput == nil || x.cumulativeDuration > criticalPathInput.cumulativeDuration {
+ criticalPathInput = x
+ }
+ }
+ }
+
+ end := cp.clock.Now()
+ duration := end.Sub(start)
+
+ cumulativeDuration := duration
+ if criticalPathInput != nil {
+ cumulativeDuration += criticalPathInput.cumulativeDuration
+ }
+
+ node := &node{
+ action: result.Action,
+ cumulativeDuration: cumulativeDuration,
+ duration: duration,
+ input: criticalPathInput,
+ }
+
+ for _, output := range result.Action.Outputs {
+ cp.nodes[output] = node
+ }
+
+ cp.end = end
+ }
+}
+
+func (cp *criticalPath) Flush() {
+ criticalPath := cp.criticalPath()
+
+ if len(criticalPath) > 0 {
+ // Log the critical path to the verbose log
+ criticalTime := criticalPath[0].cumulativeDuration.Round(time.Second)
+ cp.log.Verbosef("critical path took %s", criticalTime.String())
+ if !cp.start.IsZero() {
+ elapsedTime := cp.end.Sub(cp.start).Round(time.Second)
+ cp.log.Verbosef("elapsed time %s", elapsedTime.String())
+ cp.log.Verbosef("perfect parallelism ratio %d%%",
+ int(float64(criticalTime)/float64(elapsedTime)*100))
+ }
+ cp.log.Verbose("critical path:")
+ for i := len(criticalPath) - 1; i >= 0; i-- {
+ duration := criticalPath[i].duration
+ duration = duration.Round(time.Second)
+ seconds := int(duration.Seconds())
+ cp.log.Verbosef(" %2d:%02d %s",
+ seconds/60, seconds%60, criticalPath[i].action.Description)
+ }
+ }
+}
+
+func (cp *criticalPath) Message(level MsgLevel, msg string) {}
+
+func (cp *criticalPath) Write(p []byte) (n int, err error) { return len(p), nil }
+
+func (cp *criticalPath) criticalPath() []*node {
+ var max *node
+
+ // Find the node with the longest critical path
+ for _, node := range cp.nodes {
+ if max == nil || node.cumulativeDuration > max.cumulativeDuration {
+ max = node
+ }
+ }
+
+ // Follow the critical path back to the leaf node
+ var criticalPath []*node
+ node := max
+ for node != nil {
+ criticalPath = append(criticalPath, node)
+ node = node.input
+ }
+
+ return criticalPath
+}