diff options
Diffstat (limited to 'ui/status/critical_path.go')
| -rw-r--r-- | ui/status/critical_path.go | 6 |
1 files changed, 4 insertions, 2 deletions
diff --git a/ui/status/critical_path.go b/ui/status/critical_path.go index 444327ba..8065c60f 100644 --- a/ui/status/critical_path.go +++ b/ui/status/critical_path.go @@ -112,8 +112,10 @@ func (cp *criticalPath) Flush() { if !cp.start.IsZero() { elapsedTime := cp.end.Sub(cp.start).Round(time.Second) cp.log.Verbosef("elapsed time %s", elapsedTime.String()) - cp.log.Verbosef("perfect parallelism ratio %d%%", - int(float64(criticalTime)/float64(elapsedTime)*100)) + if elapsedTime > 0 { + cp.log.Verbosef("perfect parallelism ratio %d%%", + int(float64(criticalTime)/float64(elapsedTime)*100)) + } } cp.log.Verbose("critical path:") for i := len(criticalPath) - 1; i >= 0; i-- { |
