aboutsummaryrefslogtreecommitdiffstats
path: root/ui/status/critical_path.go
diff options
context:
space:
mode:
authorColin Cross <ccross@android.com>2020-01-03 14:43:57 -0800
committerLuca Stefani <luca.stefani.ge1@gmail.com>2020-01-04 10:43:01 +0100
commita7c950462cb94a88be5826848e896078193adc4a (patch)
tree99444183538ba0285dc26e0798532704932c720d /ui/status/critical_path.go
parent3734467777b3780e7395bbc863db5b6065eea33d (diff)
downloadbuild_soong-a7c950462cb94a88be5826848e896078193adc4a.tar.gz
build_soong-a7c950462cb94a88be5826848e896078193adc4a.tar.bz2
build_soong-a7c950462cb94a88be5826848e896078193adc4a.zip
Don't print critical path parallelism ratio if elapsed time is 0.
Test: m nothing, examine out/soong.log Change-Id: Ib23902c703d306337b2a5150d6d63b1e3d0f95b3
Diffstat (limited to 'ui/status/critical_path.go')
-rw-r--r--ui/status/critical_path.go6
1 files changed, 4 insertions, 2 deletions
diff --git a/ui/status/critical_path.go b/ui/status/critical_path.go
index 444327ba..8065c60f 100644
--- a/ui/status/critical_path.go
+++ b/ui/status/critical_path.go
@@ -112,8 +112,10 @@ func (cp *criticalPath) Flush() {
if !cp.start.IsZero() {
elapsedTime := cp.end.Sub(cp.start).Round(time.Second)
cp.log.Verbosef("elapsed time %s", elapsedTime.String())
- cp.log.Verbosef("perfect parallelism ratio %d%%",
- int(float64(criticalTime)/float64(elapsedTime)*100))
+ if elapsedTime > 0 {
+ cp.log.Verbosef("perfect parallelism ratio %d%%",
+ int(float64(criticalTime)/float64(elapsedTime)*100))
+ }
}
cp.log.Verbose("critical path:")
for i := len(criticalPath) - 1; i >= 0; i-- {